Skip to content
  • Homepage
  • Projects
  • About Us
  • Careers
  • Contact
  • News
  • English
    • Français
    • English
  • Homepage
  • Projects
  • About Us
  • Careers
  • Contact
  • News
  • English
    • Français
    • English

Home > Projects > Hyd’Occ – Green hydrogen production unit

Hyd'Occ - Green hydrogen production unit

Hydrogen plant noise study Port-La-Nouvelle

Project category :
Renewable Energies
Year of completion :
2026
Area :
53 000 sqm
Value :
60 M€
Location :
Port-la-Nouvelle, France
Client :
QAIR
Partners :
AREC Occitanie

The Hyd’Occ project, developed by Qair, an independent renewable energy producer, and AREC Occitanie, the regional energy transition agency, aims to produce large-scale green hydrogen within the port area of Port-La-Nouvelle.

The first phase of the Hyd’Occ production unit with a capacity of 20 MW and an annual production of 2,700 tonnes of renewable hydrogen, will be commissioned by the end of the year and will distribute hydrogen to stations in Occitanie, starting with the one in Béziers. This first phase will prevent the emission of 27,000 tonnes of CO2 per year into the atmosphere. This is a key contribution to the transition and decarbonisation of the road transport industry.

Located in a port environment combining industrial, logistics and residential areas, the site presented major acoustic challenges. Significant noise sources – compressors, electrolysers, cooling systems – operate continuously, 24 hours a day.

The goal was to ensure the project’s acoustic compliance with ICPE (Environmental Protection Classified Installations) regulations, while preserving the acoustic comfort of nearby residents and ensuring seamless integration within its port surroundings

Given the constraints of a 24/7 operating industrial site, we carried out a comprehensive environmental acoustic impact study based on a 3D modeling of the site and its port environment.

Our mission included:

  • Characterizing existing residual noise through day and night measurements,
  • Simulating noise levels emitted by all major equipment (electrolysers, compressors, chillers, dry coolers, pumps, transformers),
  • Verifying regulatory compliance with the decree of January 23, 1997, relating to ICPE regulations.

 

We proposed targeted noise mitigation solutions for each area, such as:

  • Acoustic insulation of technical buildings,
  • Installation of absorptive walls and baffles above compressors,
  • Treatment of ventilation openings using acoustic grilles,
  • Protective barriers around cooling areas,
  • Vibration isolation of sensitive equipment.

 

These recommendations ensure full compliance with regulations while minimizing noise disturbance for nearby residents and port users.

With our support, the Hyd’Occ project successfully validated its acoustic design and achieved ICPE regulatory compliance before the start of construction.
Our acoustic simulations optimized the layout of the noisiest equipment and confirmed compliance with the 70 dB(A) daytime and 60 dB(A) nighttime limits, ensuring controlled noise levels for the surrounding area.

By anticipating acoustic risks from the design stage, Delhom Acoustics helped make Hyd’Occ an exemplary project in industrial and environmental acoustics, supporting the region’s energy transition.

Tell us about your project

Discover similar projects

SHY Table

Hangzhou, China

Roche Accelerator Building

Zhangjiang Hi-Tech Park, Pudong, Shanghai

Starbucks China Coffee Innovation Park

Kunshan, Jiangsu, China

SANGHA Toulouse Hôtel Bar & Rooftop 

Toulouse, France

AUSTRALIAN INTERNATIONAL SCHOOL 

Ho Chi Minh City

Puy du Fou SAGA City of Light 

Shanghai, China

L’Oréal Beauty Tech Campus

Saint-Ouen, France

Phu Quoc International Airport

Phu Quoc, Vietnam

Chiesi Office

Shanghai, China
  • Homepage
  • Projects
  • About Us
  • Careers
  • News
  • Contact
  • Homepage
  • Projects
  • About Us
  • Careers
  • News
  • Contact

Acoustic consultants since 1995

Toulouse - Paris - Ho Chi Minh City - Shanghai - Dubai - Singapore

Linkedin Weixin Instagram Youtube
  • Homepage
  • Projects
  • About Us
  • Careers
  • News
  • Contact
  • Homepage
  • Projects
  • About Us
  • Careers
  • News
  • Contact

PRIVACY POLICY – TERMS AND CONDITIONS © 2025 – Delhom Acoustique SAS. All rights reserved.

Manage Cookies
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}